请有经验的朋友帮忙看看装修商给的卫生间预算

2011-08-02 · 3012 阅读
本帖最后由 米小兔 于 2-8-2011 23:47 编辑

我们是买的二手公寓。。。
只是装修一个厕所而已。。。
要求就是:把整个厕所全拆了重做。。。包括把浴缸拆了做淋浴等等。。。就是全换掉啦。。。还有现在厕所的就是普通的推开的那种门 然后我们想换成有移门 可以节约空间嘛。。。
刚拿到预算的单。。。超过我们预算还是比较多的。。。 难道新加坡做厕所真的这么贵吗? 只是一个厕所而已。。。
而且这个预算里面不包含马桶和水龙头。。。
还有我们厕所大小是2.1M*1.65M而已
谢谢分享一下你们的经验









版块:
投资理财
分类:
关注下面的标签,发现更多相似文章
回复

使用道具 举报

 

回答|共 25 个

米小兔 LV11

发表于 2-8-2011 23:03:26 | 显示全部楼层

可以看到图么?
我这边貌似显示的是XX诶。。。

方世玉 LV11

发表于 2-8-2011 23:05:38 | 显示全部楼层

我看到的也是xx

米小兔 LV11

发表于 2-8-2011 23:08:30 | 显示全部楼层

本帖最后由 米小兔 于 2-8-2011 23:31 编辑

Description:
S$
HACKING
1
Existing marbles floor at the following areas:
Master bathroom – 31sf
2
Existing wall tiles at the following areas:
Master bathroom – 215sf
3
Existing W.C bowls, basins, shower mixers, heaters, & toilet accessories in master bathroom.
4
Existing bathroom door including door frame.
5
Existing vanity cabinets at master bathroom.
6
Existing false ceiling at master bathroom.
Sub-total:
1,800.00
NEW WORK
1
To screed and make good wall finish after hacking works.
Sub-total:
500
FLOOR & WALL TILES
1
Supply labour and include sand & cement to screed floor level to receive 300mm by 300mm homogeneous floor tiles. (c/w waterproofing)
       Master bathroom – 31sqft(c/w waterproofing)
Tiles material based on not more than $3.00psf
400
2
Supply labour and include sand & cement to screed to wall to receive 300mm by 300mm homogeneous wall tiles.
        Master bathroom  – 215sqft
Tiles material based on not more than $3.50psf
1,950.00
Sub-total:
2,350.00
CEILING   
1
Supply and install false ceiling using 9mm thick fibre plaster board c/w access panel to the whole house for the internal false ceiling at the following areas: (31sqft)
Master bathroom
Sub-total:
300
GLASS WORKS   
1
To supply and install shower screens at the following areas:  
             Master bathroom  –1600L by 1800H
Sub-total:
700
OTHERS   
1
Supply & lay floor protection using corrugated paper.
300
2
General cleaning
300
Sub-total:
600
MASTER BATH
In selected laminate ply doors with internal polygen finish.
To construct & install:
Vanity cabinet c/w solid surface top.   
Size:     900L by 450D by 550H (cabinet)
550
             900L by 450D by 12thk/40drop (solid surface)
300
Wall hung cabinet with internal wooden shelf c/w clear mirror door.
Size:    900L by 150D by 1200H
810
To supply and install 1 no. of sliding frosted glass door at master bathroom.
800
To supply and install pelmet for proposed sliding track at master bathroom.
300
Sub-total:
2,760.00
Grand-total
9,010.00
GST (7%):
630.7
Total Value:
9,640.70

米小兔 LV11

发表于 2-8-2011 23:09:20 | 显示全部楼层

方世玉 发表于 2-8-2011 23:05
我看到的也是xx

现在COPY下来了 貌似有点乱乱

米小兔 LV11

发表于 2-8-2011 23:20:02 | 显示全部楼层

有点乱。。。貌似错了 重新做

米小兔 LV11

发表于 2-8-2011 23:32:03 | 显示全部楼层

整理好了 在4楼 谢谢大虾点评

爱喵人士 LV9

发表于 2-8-2011 23:43:29 | 显示全部楼层

主要是敲了的费用贵 我看了你的报价 感觉很正常啊

米小兔 LV11

发表于 2-8-2011 23:49:25 | 显示全部楼层

爱喵人士 发表于 2-8-2011 23:43
主要是敲了的费用贵 我看了你的报价 感觉很正常啊

这样啊。。。
那我想的太便宜了。。。
因为以前看过一个很漂亮的厕所 据说也就五六千 面积还比我们的大不少。。。
所以我的预算也就只考虑在6K左右

vitality LV13

发表于 3-8-2011 09:06:00 | 显示全部楼层

本帖最后由 vitality 于 3-8-2011 09:19 编辑

好贵啊

楼主找的是ID还是contractor?
123下一页