大家帮忙看下装修商给我的报价合理吗?

2010-10-06 · 2283 阅读
BHACKING / DIMANTLE WORKS
Master Bedroom
1Supply labour to opening new door area
Kitchen Area
2Supply labour to hack off existing floor tiles
3Supply labour to hack off existing wall tiles
4Supply labour to dismantle existing kitchen cabinet
5Supply labour to hack existing cement mortar base for cabinet, fridge & washing machine
Master Bathroom
6Supply labour to hack off existing floor tiles
7Supply labour to hack off existing wall tiles
8Supply labour to hack existing fittings & accessories
9Supply labour to dismantle existing door
Common Bathroom
10Supply labour to hack off existing floor tiles
11Supply labour to hack off existing wall tiles
12Supply labour to hack existing fittings & accessories
13Supply labour to dismantle existing doorSub-total:
$
2,280.00
CMASONRY WORKS
Master Bedroom
1Supply labour & material to make good after hack off new openingSub-total:
$
380.00
Kitchen Area (based on tiles @ $2.80 psf)
2Supply labour & material to lay 300mm x 300mm homogeneous floor tiles
3Supply labour & material to lay 300mm x 300mm homogeneous wall tiles (exposed area)
4Supply & apply water proofing membrane treatment
5Supply labour & material to construct kitchen cabinet baseSub-total:
$
4,000.00
Master Bathroom (based on tiles @ $2.80 psf)
6Supply labour & material to lay 300mm x 300mm homogeneous floor tiles
7Supply labour & material to lay 300mm x 300mm homogeneous wall tiles
8Supply & apply water proofing membrane treatment
9Supply labour & material to construct drop kerd
10Supply labour & material to make good walls at affected areaSub-total:
$
2,400.00
Common Bathroom (based on tiles @ $2.80 psf)
11Supply labour & material to lay 300mm x 300mm homogeneous floor tiles
12Supply labour & material to lay 300mm x 300mm homogeneous wall tiles
13Supply & apply water proofing membrane treatment
14Supply labour & material to construct drop kerd
15Supply labour & material to make good walls at affected areaSub-total:
$
2,400.00
版块:
投资理财
分类:
关注下面的标签,发现更多相似文章
回复

使用道具 举报

 

回答|共 11 个

ForzaJuventus LV6

发表于 6-10-2010 12:06:25 | 显示全部楼层

小狮租房
E        PLUMBING WORKS               
1        Supply labour & material to lay stainless steel piping (cold only) at kitchen & 2 bathrooms               
2        Supply labour & material to lay inlet/outlet and drainage piping for sink & washing machine               
3        Supply labour to install kitchen sink & tap at kitchen area               
4        Supply labour to install 2 sets bathroom accessories at 2 bathrooms               
5        Supply labour to install 2 sets instant heater at 2 bathrooms               
6        Supply labour to install 2 sets wash basin c/w tap at 2 bathrooms               
7        Supply labour to install 2 sets W.C. suite at 2 bathrooms        Sub-total:         $1,250.00
                       
F        PAINTING WORKS               
1        Supply & apply painting whole unit using ICI DULUX emulsion paint (walls & ceiling)               
2        Supply & apply painting all piping using ICI DULUX emulsion paint        Sub-total:         $1,380.00
                       
G        CEILING WORKS               
        Living Area               
1        Supply labour & material to construct L box (as per design)               
                       
        Passageway Area               
2        Supply labour & material to construct false ceiling c/w light pelmet (as per design)               
                       
        Dining Area               
3        Supply labour & material to construct false ceiling c/w light pelmet (as per design)        Sub-total:         $1,280.00
                       
H        CARPENTRY WORKS                
        Master Bedroom               
1        Design , fabricate & install 17.5ft full ht wardrobe c/w sliding door (as per design)                 $4,550.00
        (using plywood in laminated / mirror / glass finish c/w internal white PVC)               
-        drawer c/w lock               
-        safe compartment               
-        adjustable shelving               
-        hanging bars               
                       
2        Design , fabricate & install 7ft suspended study table c/w drawer (as per design)                 $1,100.00
        (using plywood in laminated / mirror / glass finish c/w internal white PVC)               
                       
        Dining Area               
3        Design , fabricate & install 6ft suspended half ht display cabinet (as per design)                 $1,200.00
        (using plywood in laminated / mirror / glass finish c/w internal white PVC)               
                       
        Kitchen Area               
4        Design, fabricate & install 14.5ft top kitchen cabinet in high pressure laminate finishes c/w ABS trimming                  $1,740.00
                       
5        Design, fabricate & install 14.5ft bottom kitchen cabinet in high pressure laminate finishes c/w ABS trimming                  $1,740.00
                       
6        Supply labour & material to install 14.5ft solid surface kitchen worktop                 $1,088.00
                       
I        ELECTRICAL WORKS               
1        Supply labour & material to install 18 nos new lighting points               
2        Supply labour only to install 18 nos new lighting points               
3        Supply labour & material to install 1 set cooker hood & hob points               
4        Supply labour & material to install 03 nos double power points        Sub-Total:         $1,100.00
                       
5        Other Electrical works to be quote on site                 TBC

ForzaJuventus LV6

发表于 6-10-2010 12:06:47 | 显示全部楼层

H        DOOR / GLASS WORKS               
        Master Bathroom               
1        Supply labour & material to install 10mm thk clear glass shower screen c/w casement door        1 Set       
2        Supply labour & material to install 1 set bi-fold (aluminium frame c/w PVC panel)        1 Set       
                Sub-total:         $600.00
        Common Bathroom               
3        Supply labour & material to install 1 set bi-fold (aluminium frame c/w PVC panel)        1 Set         $210.00
                       
M        MISCELLANEOUS               
1        General clearing and acid washing of whole unit flooring                 $250.00
2        Debris removal                 $250.00
3        Haulage services                  $200.00
4        Protection of flooring with cardboard                 $200.00
5        Apply HDB renovation permit                 FOC
                       
                       
                       
        Grand Total For The Above Mentioned Renovation Works:                 $29,598.00
        7 % GST:                 $2,071.86
        After 7 % GST:                 $31,669.86

ForzaJuventus LV6

发表于 6-10-2010 12:07:27 | 显示全部楼层

我的天 怎么这么长。。。总共3万多 大家觉得合适吗??

fermifish1 LV6

发表于 6-10-2010 12:32:14 | 显示全部楼层

我家最近也要装修,你这个是ID还是contractor啊?

fermifish1 LV6

发表于 6-10-2010 12:34:41 | 显示全部楼层

还有你家是几房的呢?不然差很多

ElvisYang LV6

发表于 6-10-2010 14:17:41 | 显示全部楼层

很多公司都没有收GST的呀~~

ForzaJuventus LV6

发表于 6-10-2010 14:33:31 | 显示全部楼层

我的这个是ID 在hub21找的 是不是有点贵

ForzaJuventus LV6

发表于 6-10-2010 16:47:04 | 显示全部楼层

有比较懂装修的人帮我看看嘛??

zhuxiaoyu110 LV0

发表于 7-10-2010 00:12:18 | 显示全部楼层

提示: 作者被禁止或删除 内容自动屏蔽
12下一页
您需要登录后才可以回帖 登录 | 注册会员