A | kitchen | |
1 | demolition exrg. All cabinet ,& part of extg. Timber entrance with door |
$
400.00 |
2 | construct gypsum board partition with cutting/opening entrance 厨房与餐厅之间假墙 |
$
780.00 |
2a | supply / install sliding door - aliminium frame / arcylic panel 这个门是cheap的那种? |
$
420.00 |
3 | construct cement base with tiles at
the side for cabinet |
$
350.00 |
4 | construct cement base with tiles finishes for fridge |
$
180.00 |
B | living / dining room | |
1 | dimolition extg. Cornice ,cabling , all light fitting & TV cabinet |
$
450.00 |
2 | supply / install L shape cove light holder 有cove light的会否贵一些? |
$
1,400.00 |
C | common toilet | |
1 | demoiltion floor tiles and cement screed |
$
350.00 |
2 | water profing the floor slab |
$
250.00 |
3 | supply / laid floor tiles (provide sum of $3.00 psf of tiles )地砖和防水分开算? |
$
1,350.00 |
4 | supply / install sliding door -aluminium frame / arcylic panel |
$
420.00 |
D | master toilet | |
1 | demolition extg. Long-bath and hollow block support & wall / floor tiles |
$
1,200.00 |
2 | supply / laid floor tiles (provide sum of $3.00 psf of tiles ) |
$
1,350.00 |
3 | water proofing the floor slab |
$
250.00 |
4 | supply / laid wall tiles (provide sum of $3.00 psf of tiles ) |
$
2,600.00 |
5 | supply / install water closet include outlet pipe |
$
420.00 |
6 | supply / install wash basin include inlet/out pipe |
$
320.00 |
7 | supply / install stainless steel pipe (cold ) one way |
$
350.00 |
8 | supply / install naytoh timber door frameand door |
$
560.00 |
E | Miscellaneous | |
1 | provide labour to clear and remove debris away from the premises include MOE TAX |
$
400.00 |
2 | supply dust sheets protection to extg. Facilities
|
$
300.00 |
3 | Painting whole house (wall/ceiling ) using ICI pentalite 这种漆好像很差 |
$
1,450.00 |
4 | supply / install DAKIN inverter 3-in -1 air condition |
$
3,250.00 |
5 | re-polish extg.floor marble tiles
|
$
900.00 |
6 | re-polish existing floor parquet for 3 rooms 为啥木地板要这么贵? |
$
1,600.00 |
7 | ELECTRICAL WORKS 电工我自己觉得每一项都偏贵 |
$
4,180.00 |
| double power point
- 15 numbers x @$65 |
$
975.00 |
| SCV power point
- 4 numbers x @$120 |
$
480.00 |
| lighting point
- 38 numbers x @$45 |
$
1,710.00 |
| air condition power point
- 1 number
|
$
150.00 |
| telephone point
- 4 numbers x @$70 |
$
280.00 |
| single power point
- 1 number |
$
70.00 |
| washing machine power point - 1 number |
$
75.00 |
| water heater power point
- 2 numbers x @150 |
$
300.00 |
| DB box -1 lot |
$
150.00 |
8 | Provide labour to remove extg. Build-in cabinet at master bedroom |
$
200.00 |