To change 3 bedrooms doors with lockers + plastic magnetic stopper | 840 |
To change main gate (none-anti-fire) with locker and stopper | 480 |
To change 2 bi-fold PVC door for both toilet | 400 |
Painting for the whole house use Nippon or ICI
| 1300 |
Hack the skirting and plastering for the damage area | 300 |
Screening and repair the living room damage area | 200 |
Raise up the balcony to the living room level and block the balcony 2 holes | 200 |
Lay laminate floor for all bedrooms, living room, balcony and passenger way (3.5 PSF) | 4052 |
Install skirting for laminate floor
| FOC |
To hack the wardrobe in bedroom 3 | 100 |
Haulage fees | 300 |
Electrical works * | |
| |
Total | 7872 |
| |
Options: | |
to upgrade to 3 x stainless steel magnetic door stopper | 30 |
to add chemcial wash for the whole house upon completion | 200 |